We are Ready For any places moving!

700mce hot rolled automotive steel alloy chart

700mce hot rolled automotive steel alloy chart

We have a stable system and professional human resource management work as the support, from the six aspects of guidance, cohesion, incentive, constraint, radiation and stability, we continue to introduce, modify and train employees from concept to action

700mce hot rolled automotive steel alloy chart

We have a stable system and professional human resource management work as the support, from the six aspects of guidance, cohesion, incentive, constraint, radiation and stability, we continue to introduce, modify and train employees from concept to action, and shape employees through constant guidance of common values.

Seamless steel tubes for high-pressure boilers are mainly used in pipes, headers, economizers, superheaters and heat exchangers of high-pressure boilers. The working pressure of seamless steel tubes for high-pressure boilers is generally above 9.8 MPa and the working temperature is between 450℃ and 650℃. The main grades of seamless steel tubes for high pressure boilers are 15CrMoG, 12CR2MOG, 12Cr1MoV, 700mce hot rolled automotive steel, etc.. For the seamless steel tubes used for high pressure boilers, their service environment and related properties are also different for different grades.

Automobile girder steel is a kind of low alloy hot-rolled steel plate with thickness of 2.5-12.0 mm for manufacturing automobile girder (longitudinal beam and cross beam). Due to the complex shape of automobile girder, good stamping performance is required in addition to high strength and cold bending performance for automobile girder steel. The 700mce hot rolled automotive steel, medium thick and heavy steel plates are mainly used in construction engineering, machinery manufacturing, container manufacturing, shipbuilding, bridge construction and so on.

In December of 2015, our regular India customer sent us an inquiry for 700mce hot rolled automotive steel pipe. The inquiry requires no negative tolerance in both pipes’ outer diameter and pipe wall. After two weeks’ discussion, he put the order of 275 tons to us. The pipes are finished within just one month. Our customer come to our factory to inspect the quality and tolerance, all the products are well meet his demand. The pipes are arriving to Nhava Sheva port, customer is very happy with our products and service during the process.

Leave a message

Your email address will not be published. Required fields are marked *